2021 Greenback Lane Complete Streets Improvements Project - No. 45-20-002

The work to be performed consists, in general, of placing hot mix asphalt overlay, including placement of geo-textile fabric, AC pavement grinding, constructing PCC curb and gutter, sidewalk, retaining curbs, ADA compliant curb ramps, adjusting manholes/utility irons to grade, replacing deteriorated storm drain pipe, installing drainage inlets/manholes, restoring traffic striping, legends and markings, and traffic signal modifications with signal interconnect; and all other works as shown on the contract documents.

Status

Accepting Bids

Prebid Date12/1/21 1:00pm

Bid Date12/15/21 2:00pm

Company & Contacts

City of Citrus Heights

Hunter Young   hyoung@citrusheights.net

Location

Citrus Heights, CA

Engineer’s Estimate: $2,400,000