Citywide Accessibility Improvements No 8 Project 2519
The scope of work is generally for constructing curb ramps at various locations throughout the City of Concord. Work shall include traffic control, pedestrian detours, staging of the work, water pollution control program, clearing and grubbing, curb and gutter, sidewalk, valley gutter, asphalt concrete removal, hot mix asphalt, pavement marking removal and installation; and such other items or details that are required by the Plans, Standard Specifications, the Special Provisions and as directed by the Engineer.
Status
Bidding Closed
Bid Date11/4/21 2:00pm
Company & Contacts
City of Concord - Engineering Services
Tianjun Cao
925-671-3243
Location
Concord, CA
The Engineer’s estimated construction cost ranges from $300,000 to $400,000 for the base bid plus additive bids. The Contractor shall possess at least one of the following valid Contractor’s licenses at the time the bids are opened: Class “A”: General Engineering Contractor, or; Class “C-8”: Concrete Contractor.