Harbor Bay Isle Lagoon Improvements Project

The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with the Harbor Bay Isle Lagoon stormwater control system including all demolition work including handling and legal disposal of lead containing materials, structural concrete repair and new concrete work, coating of concrete surfaces, new chain link fencing, new galvanized grating, installation of a new owner-furnished gate actuator, new level control instruments, installation of owner-furnished electrical enclosures and controls, all electrical improvements, testing, site restoration, temporary controls, and all other work as shown on the Plans and as called for in the Special Provisions and as directed by the Engineer.

Status

Bidding Closed

Bid Date10/7/21 2:30pm

Company & Contacts

City of Alameda
Erin Smith  
ESmith@alamedaca.gov

Location

This Project is situated in the following City facility locations on Bay Farm Island: Lagoon 1 North Outlet (San Leandro Channel); Lagoon 1 Safeway Monitoring Station (Safeway Plaza); Lagoon 1 South Inlet (Shoreline Park)

Documents

BIDS DUE BY: THURSDAY, OCTOBER 7TH, 2021 @ 2:30 PM

ENGINEER’S ESTIMATE: $250,000