Bay Trail Soil Nail Wall Sinkhole Repair Project

The Project is located 1,000 feet northeast along the San Francisco Bay Trail from the intersection of Bayfront Blvd. and John Muir Pkwy in the City of Hercules (38°01 '22.3"N, 122°16'52.5"W), and is described as follows: In general, the wall repair work to be performed consists of mobilization, erosion control, grading work, removal and installation of concrete valley gutter/trench, and all other work as shown on the Plans.

Status

Accepting Bids

Prebid Date 7/29/25 9:00am
Bid Date 8/12/25 2:00pm

Company & Contacts

City of Hercules
Jose Pacheco  

. The estimated construction cost is $80,000.

A bidders' conference will be held on July 29, 2025, at 9:00 a.m., at the following location: Entrance driveway to project site at the end of Linus Pauling Drive as shown on Sheet C-3 of the project plans to acquaint all prospective bidders with the Contract Documents and the Worksite. The bidders' conference is not mandatory.