San Pablo Creek Culvert Repair Project

The work to be done generally consists of removing debris in the culvert, cleaning the culvert invert, preparing concrete surfaces and exposed rebar, installing new rebar along the culvert invert, overlaying the culvert invert, installing new concrete beam and steel struts, repairing storm drain connection to the culvert, and bypass of creek channel flows as necessary for construction.

Status

Bidding Closed

Prebid Date4/9/24 10:00am

Bid Date4/23/24 2:00pm

Company & Contacts

City of Orinda
T. Ryan O’Kane  
(925) 253-4282

Location

City of Orinda

Engineer's cost estimate: $2,300,000 

A pre-bid meeting will be held on Tuesday, April 9, 2024 at 10:00 a.m. at the entrance to the culvert at storage and staging Areas A1 & A3 to review project construction. Prospective bidders attendance is recommended but not mandatory.