Citywide Sidewalk Repair Project No. 2666
The work to be done in general consists of mobilization; traffic control and pedestrian detours; water pollution controls; clearing and grubbing; removal & replacement of concrete sidewalk, curb & gutter; tree root protection; placement of shoulder backing material; curb paint; and all other work shown on the Plans and as specified in these Special Provisions.
    
    
    
    
    
    
    
            
                                                Plans
                
 (click to expand/collapse)
            
            
 (click to expand/collapse)
            | Name | Size | ||
| PJ2666 Final Plans | 10.2 MB | 

