Slurry Seal Project Phase 1 No. 23-5552

The work, in general, consists of pavement maintenance, including:crack sealing; slurry seal; removal and replacement of hot mix asphalt (HMA) paving; traffic striping; traffic control; water pollution control; and related items of work as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
No files available