2023 Citywide Pothole & Base Repair Project, PJ No. 2593

The work to be done in general consists of mobilization; traffic control plan development; water pollution control program; cold planning; placement of hot mix asphalt materials; pruning and removing tree roots; lowering and adjusting utility covers to finish grade; removal and replacement of traffic striping and pavement markings; installation of shoulder backing; removal and replacement of loop detectors; and all other work shown in the Plans and as specified in these Special Provisions.
Specifications (click to expand/collapse)
Name Size
PJ2593 Specs 11.1 MB