2023 Countywide Pavement Digouts

The work to be done generally consists of pavement dig outs and base failure repairs in the unincorporated Bay Point, Lafayette, Pacheco, Contra Costa Centre areas, and Kirker Pass Road. Work in the Bay Point Area (Site 1) includes mill and overlay with placement of thermoplastic striping and markings on Concord Avenue. Work in the Pacheco Area (Site 2) includes mill and overlay with placement of thermoplastic striping and markings on North Broadway. Work in the Lafayette Area (Site 5) includes mill and overlay of three cul-du-sacs; Jennifer Highlands Ct., Dana Highlands Ct., and Julie Highlands Ct. Work in all areas also includes placement of temporary paint striping, pavement failure repair, and traffic signal loop installation.
Addendum 1 (click to expand/collapse)
Name Size
CCC_Add1_2025 83.5 KB
Addendum 2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
CCC_Add2_2025 625.4 KB
CCC_QA2_2025 108.8 KB
Q&A (click to expand/collapse)
Name Size
CCC_QA2_2025 108.8 KB