Citywide Sidewalk Repair Project No. 2666
The work to be done in general consists of mobilization; traffic control and pedestrian detours; water pollution controls; clearing and grubbing; removal & replacement of concrete sidewalk, curb & gutter; tree root protection; placement of shoulder backing material; curb paint; and all other work shown on the Plans and as specified in these Special Provisions.
| Filetype Icon | Name | Size | Quick Download |
|---|---|---|---|
| 190.2 KB | Download |

