Citywide On-Call Sidewalk Replacement Phase 3, Project 2341

The work to be performed under this Contract shall include the furnishing of all labor, materials, and equipment required to remove and reconstruct designated sections of sidewalk, driveways, curb ramps, and curb and gutter, including removal and replacement of associated asphalt and base or subgrade materials, and all other work as specified in these Special Provisions and as directed by the Project Manager in the field.
No files available