PVHS Building E Lobby & Corridor Flooring Replacement Project
The Project consists of removal of existing flooring including existing crack filler, existing adhesive and existing wall base. Prepare concrete floor slab including repair work and install dust protection, new moisture control system, new resilient flooring and new wall base.
Status
Bidding Closed
Bid Date5/18/22 2:00pm
Company & Contacts
West Contra Costa Unified School District
Facilities Operation Center
(510) 307-4545
Location
Pinole Valley High School