Pavement Maintenance – Zone 3 Project No 2443

The work to be done in general consists of mobilization; traffic control; water pollution control program; cold planning of asphalt roadway section; crack sealing; placement of Hot Mix Asphalt (HMA) leveling course and Thin Maintenance Overlays (TMO); removal & replacement HMA; removal & replacement of concrete sidewalk, curb & gutter, curb ramps, driveways and valley gutters; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; removal & replacement of traffic striping and pavement markings; installation of roadside signs and pedestrian barricades; and all other work shown on the Plans and as specified in these Special Provisions.
Addendum 1 (click to expand/collapse)
Name Size
2021-11-24_2443 Addendum 1 250.0 KB
Addendum 2 (click to expand/collapse)
Name Size
2021-12-15_2443 Addendum 2 3.4 MB
Addendum 3 (click to expand/collapse)
Name Size
2022-01-07_2443 Addendum 3 151.5 KB