Clayton Road Traffic Operations Improvements - Phase 1 PJ 2547

The work to be done consists of, mobilization; traffic control and construction signage; installation of fiber optic communications cable in conduit, conduits, pull boxes, fiber optic splicing and testing, fiber optic switches, fiber optic small form pluggable modules, fiber pig tails, and other such items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Specifications (click to expand/collapse)
Name Size
PJ2547_FinalSpecs 8.2 MB
PJ2547_NTC 78.4 KB