Clayton Road Traffic Operations Improvements - Phase 1 PJ 2547

The work to be done consists of, mobilization; traffic control and construction signage; installation of fiber optic communications cable in conduit, conduits, pull boxes, fiber optic splicing and testing, fiber optic switches, fiber optic small form pluggable modules, fiber pig tails, and other such items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Addendum 1 (click to expand/collapse)
Name Size
2021-09-13_2547 Addendum 1 249.7 KB
Addendum 2 (click to expand/collapse)
Name Size
2021-09-15_2547 Addendum 2 1.5 MB
Addendum 3 (click to expand/collapse)
Name Date Size
2021-09-29_2547 Addendum 3 9/29/2021 147.5 KB