Orinda City Hall North Parking Lot Slope Stabilization

The work to be done generally consists of the installation of concrete stabilization piles, grade beam, and the replacement of an existing retaining wall and relocation of 2 utility cleanouts.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
4108 City Hall Slope Stabilization-Geotechnical Investigation Report 5.1 MB
Addendum No. 1- 4108 212.9 KB