Orinda City Hall North Parking Lot Slope Stabilization
The work to be done generally consists of the installation of concrete stabilization piles, grade beam, and the replacement of an existing retaining wall and relocation of 2 utility cleanouts.
Addendum 1
(click to expand/collapse)
Name | Size | |||
4108 City Hall Slope Stabilization-Geotechnical Investigation Report | 5.1 MB | |||
Addendum No. 1- 4108 | 212.9 KB |