Gladys Avenue, El Dorado Street and B Street Improvement Project

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Mobilization; traffic control and construction signage; cold planning; edge grinding; roadway excavation; AC patch paving; AC paving; concrete sidewalk, curb and gutter, driveway, curb ramp; tree removal and planting; pavement; traffic signs; delineation; striping and pavement marker installation and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Plans (click to expand/collapse)