R19-79 Year 2 Pavement Restoration Project

The work generally consists of constructing full depth asphalt concrete repairs, pavement grinding, asphalt concrete overlays, traffic striping, crosswalk markings,sidewalk replacement, valley gutters replacement, curb and gutter repairs, ADA curb ramp upgrades, and installing signage when applicable and other miscellaneous work as described herein. The proposed work shall be performed in accordance with the plans, specifications and other contract documents.
Plans (click to expand/collapse)
Name Size
R19-79 Phase 2 - signed plans 16.7 MB