Gateway BLVD Median Island Modification Project

The work consists of constructing new median curbs andirrigation and landscaping for an abandoned left turn lane pocket which includes but is not limited to the sawcutting and removals of existing asphalt concrete (AC) pavement and Portland Cement Concrete (PCC) curbs, island nose paving and then constructing new City Standard Type A curb to restore a full 8 inch high median curb, patching AC pavement along new curb, excavating and removal AC pavement and base rock section at old left turn lane and then furnishing and placing of clean sandy loam import topsoil for a new wider median landscape area, modifications of irrigation systems and establishment of new landscape plantings, and relocation of median keep right sign behind new median nose curb. See Special Provisions Section 30.3 for Traffic Control Restrictions required forthis project.
Plans (click to expand/collapse)