Storm Damage Repair Project

At the Alhambra Valley Road at Ferndale site, work includes construction of a soldier pile retaining wall, drainage improvements, guardrail and vegetation control, and reconstruction of the roadway. At the Alhambra Valley Road West of Castro Ranch Road site, work includes remedial grading and reconstruction of the embankment, construction of guardrail and vegetation control, and reconstruction of the roadway. At Bear Creek Road, there are two sites, 3A and 3B. At site 3A, work includes construction of a soldier pile retaining wall, drainage improvements, guardrail and vegetation control, and reconstruction of the roadway. At site 3B, work includes remedial grading and reconstruction of the embankment, construction of guardrail and vegetation control, and reconstruction of the roadway.
GFE (click to expand/collapse)
Name Size
CCC_GFE_6226 1.4 MB
Informational Handout (click to expand/collapse)
Specifications (click to expand/collapse)
Name Size
CCC_NTB_6226 129.6 KB
CCC_PC_6226 1.3 MB
CCC_SP_6266 53.9 MB