Fred Jackson Way First Mile/Last Mile Connection

The work to be done generally consists of street improvements along FredJackson Way between Brookside Drive and Grove Avenue including constructing widened sidewalks, bulbouts and storm drain modifications and installation of street trees and irrigation. Project will also includepavement grinding, installation of SAMI (Stress Absorbing Membrane Interlayer), HMA widening andoverlay, and construction of HMA pedestrian path.
Plans (click to expand/collapse)
Name Size
CCC_Plans(Full)_4153 7.4 MB