Vine Trail Gap Closure - Soscol Avenue Corridor ST18PW08

The work generally consists of removing and constructing sidewalk, curb and gutter, constructing a hot mix asphalt multi-use trail, adjust utilities to grade, relocating water utilities, installing streetlights, installing railroad signal system, signing and striping.