Laurel Creek Community Park Ball Field Lighting Improvements

The work of this project is to be conducted at Gulf Drive (Laurel Creek Park), located within the corporate limits of the City of Fairfield as shownon the project plans. Demolition of existing lighting fixtures, devices, and associated cables. Furnish and install electrical equipment and devices, lighting fixtures, controls and conduits, andassociated electrical infrastructure and all other items or details not mentioned above that are required by the City of Fairfield Standard Specifications, or these Special Provisions, as specified in the Contract Documents, and as directed by the City Engineer.
Specifications (click to expand/collapse)