Laurel Creek Community Park Ball Field Lighting Improvements

The work of this project is to be conducted at Gulf Drive (Laurel Creek Park), located within the corporate limits of the City of Fairfield as shownon the project plans. Demolition of existing lighting fixtures, devices, and associated cables. Furnish and install electrical equipment and devices, lighting fixtures, controls and conduits, andassociated electrical infrastructure and all other items or details not mentioned above that are required by the City of Fairfield Standard Specifications, or these Special Provisions, as specified in the Contract Documents, and as directed by the City Engineer.

Status

Bidding Closed

Bid Date12/15/20 2:00pm

Company & Contacts

City of Fairfield, CA
Caroline Vedder  
cvedder@fairfield.ca.gov

Location

Fairfield, CA

PUBLIC WORKS DEPARTMENT
Laurel Creek Community Park Ball Field Lighting Improvements Bid OpeningZoom Information
Topic: Laurel Creek Community Park Ball Field Lighting Improvements Bid Opening
Time: Dec 15, 2020 02:00 PM Pacific Time (US and Canada)Join Zoom Meeting
https://fairfieldca.zoom.us/j/94331399444?pwd=NWlRNkdCd1dzMkY5WUs2VTFzekt6UT09
Meeting ID: 943 3139 9444Passcode: openbids1
Dial by your location
+1 213 338 8477 US (Los Angeles)+1 408 638 0968 US (San Jose)+1 669 219 2599 US (San Jose)+1 669 900 6833 US (San Jose)
Meeting ID: 943 3139 9444Passcode: 768961566
Find your local number: https://fairfieldca.zoom.us/u/aekPRsl1d