Bel Air Trail Crossing Project

The work to be done generally consists of pavement widening, construction ofbulb outs, asphalt path, HMA dike, curb ramps, driveway conforms, and installation of pedestrian activatedflashing beacons along Madison Avenue.
Plans (click to expand/collapse)
Name Size
CCC_Plans_Full_4056 943.6 KB