2020 Fema-Caloes Alhambra Creek Bank Stabilization Project
urnish all labor, materials, tools, equipment and supervision and perform all work necessary for and incidental to the construction of the project known as the 2020 FEMA/CALOES Alhambra Creek Bank Stabilization Project, City Project No. M5005 & M5009. The work includes but is not limited to providing traffic control,removing concrete wall, removing & replacing fencing, removing a tree, constructing new pile wall, planting a new tree, installing storm drainpipe, replacing dirt slope with rock protection.
Status
Bidding Closed
Bid Date9/10/20 2:00pm
Company & Contacts
City of Martinez
Randy Leptien
randy.leptien@lcc-inc.com
Location
Martinez, CA
The Engineer’s Estimate is:
Total Bid Schedule A: $ 278,700.00
Total Bid Schedule B: $ 130,800.00
Total Base Bid = A + B: $ 409,500.00